Skip to content
Groundstone

Services

Three things we sell, in the order you need them.

A site can come in at any stage. Most come in as an address. The quantities that screen the site are the quantities that price it and the quantities the trades bid against, and the superintendent who builds it has read the plan set since the first issue. Nothing gets measured twice and nothing gets handed off cold.

  1. 01Screening and layout
  2. 02Preconstruction and engineering
  3. 03Construction and management

01

Screening and layout

What a site will yield, what gets in the way, and a layout that proves it.

Send us an address or a boundary. We read the zoning and what it allows, the floodplain and wetlands, slope and soils, where sewer and water are and how deep, and the fees the jurisdiction will charge.

Then we lay it out: lots, roads, ponds and open space, with a yield for each option and a first number against it. If the site does not work, you find out here, while walking away is still cheap.

You send
An address, a parcel number, or a boundary. A seller's brochure or an old plan set helps but is not required.
You get
A layout, a lot count, and a go or no-go.
  • Yield to the code

    The lot count the zoning allows on this parcel, with the setbacks, lot widths and open-space rules that got there.

  • Constraints

    Floodplain, wetlands, slope, soils, easements, sewer depth and distance, water pressure and access, and what each one costs in lots or dollars.

  • Lot and road layout

    Two or three concepts drawn to the code, with the yield and the dirt for each. Overlaid on the drone flight so you can see it on the ground.

  • Go or no-go

    A plain read on whether the deal is worth the next dollar, and the three unknowns that would change the answer.

  • Drone pull-back over a freshly paved subdivision loop road with graded lots
  • Drone descent over a cul-de-sac under construction with rows of finished homes beside it
  • Low aerial pass over an open pasture with a tree line at the far edge, before any site work has started
  • Aerial view of a finished subdivision loop road with paved streets, curb and gutter, and graded pads, no houses yet, the county road in the foreground
  • Aerial view of open pasture with tree lines at the edges before any site work has started
  • Aerial view of an excavator pushing down pines at the edge of a wooded tract, red clay exposed behind it
  • Aerial view of the same subdivision loop road, now paved, with graded lots and no houses
  • Aerial view of the same subdivision loop road with a row of new houses under construction along one side

02

Preconstruction and engineering

An approved plan set, measured quantities, and a number a lender can underwrite.

We carry the layout through civil design, survey and permitting. Engineering and surveying are performed and sealed by licensed partner firms. Groundstone runs the schedule and the cost check around them, so the plan set that gets approved is the one that was priced.

From the plan set we measure every quantity: cut and fill, pipe by size and depth, structures, stone, asphalt and curb. The number comes from those quantities, not from a cost per lot, and the trades bid against the same takeoff.

You send
A layout from us, or a plan set from your own engineer.
You get
An approved plan set and a number.
  • Civil design and permitting

    Construction plans, boundary and topographic survey, and the submittals through to approval, sealed by licensed partner firms.

  • Quantities and earthwork

    A measured takeoff of the whole plan set and a cut-and-fill model, so the dirt number is a number and not a guess.

  • Bid packages and leveling

    Scopes by trade, bids against the same quantities, and a leveled comparison that shows what each one left out.

  • Schedule and budget

    A division-by-division schedule and a budget tied to it, in the form a lender's underwriting needs.

  • A crew member in a deep cut reads grade on a GPS rover and tablet, filmed from the drone above
  • Jacob Kriser on a cleared building pad, talking through the site, an excavator and stockpiles behind him
  • Low aerial pass over an open pasture with a tree line at the far edge, before any site work has started
  • Aerial view of a dozer and an excavator working building pads beside a curbed street on a subdivision under construction
  • Aerial view of open pasture with tree lines at the edges before any site work has started
  • Aerial view of a paved subdivision street with graded building pads on both sides, a finished house at the entrance and framing started at the far end
  • A field crew member in a cut holds a GPS rover pole and reads the grade on a tablet
  • A freshly cut drainage channel holding water between two lines of silt fence

03

Construction and management

Clearing to finished lots on one schedule, with one builder accountable for all of it.

Clearing, erosion control, grading, storm, sewer, water, paving and curb, under one schedule and one superintendent. One builder accountable for the whole schedule, from the first tree down to the recorded plat.

For owners who hold their own contracts, we run the field: superintendent oversight, inspections, the schedule, and the progress and draw reports a lender signs off on.

You send
An approved plan set and a notice to proceed.
You get
Finished lots a builder can start on.
  • Site construction

    Every horizontal division on one schedule, built by the crew that priced it, with the plan set open since the first issue.

  • Field oversight

    A superintendent on your site daily, running the trades, the inspections and the schedule, and reporting to you.

  • Progress and draw reports

    Quantities in place against the budget, photographed and dated, in the form a lender draws against.

  • Closeout

    As-builts, bond release, the recorded plat, and finished lots a builder can start on.

One schedule, every division.

The horizontal divisions in the order they are built on a Groundstone site, and how they overlap. One builder accountable for the whole line.

Notice to proceedFinal acceptance
31 00 00Clearing and mass grading
Grading
33 30 00Sanitary sewer
Sewer
33 40 00Storm drainage
Storm
33 10 00Water distribution
Water
32 16 00Curb and gutter
Curb
32 10 00Base and paving
Paving
Representative sequence for a phased subdivision package. Overlaps are what one crew under one superintendent can run. Actual durations come from the plan set and the phasing.
  • Drone flight down a cleared sewer corridor: bedding stone and manhole sections staged, a dozer at the head of the run
  • A crew member in a deep cut reads grade on a GPS rover and tablet, filmed from the drone above
  • Low aerial pass over an open pasture with a tree line at the far edge, before any site work has started
  • Aerial view straight down a freshly paved subdivision street from the county road, red clay building pads on both sides and paving equipment at the entrance
  • Aerial view looking down a subdivision street at subgrade with freshly poured curb and gutter on both sides
  • Aerial view of a dozer and an excavator working building pads beside a curbed street on a subdivision under construction
  • Aerial view of a finished subdivision loop road with paved streets, curb and gutter, and graded pads, no houses yet, the county road in the foreground
  • Aerial view of an excavator pushing down pines at the edge of a wooded tract, red clay exposed behind it

Send us a site.

An address, a boundary, or a full plan set. We come back with a layout and a number, or with the questions that decide whether it is worth one.

Send us a site